so far we have the pistons set up for our climbing mechanism and are testing. all we have left is to attache and set up the motors to move the pistons, and finalise a couple things. then we will think of a way to dump frisbees into the bucketr at the top of the pyramid but we arent positive that we will be doing that yet. cant wa